Plant operation and maintenance services
Industrial maintenance management, shutdown and turnaround support, and spare parts for plants that have to keep running.
Industrial maintenance services for plant owners and operators
Maintenance management
Preventive, predictive and corrective maintenance plans, work order control and performance reporting.
Spare parts management
Critical spares lists, stock levels, sourcing and replacement of obsolete parts.
Shutdowns, turnarounds and outages
Planning, materials and specialist support for planned stops.
Commissioning and start-up
Technical support during pre-commissioning, commissioning and first operation.
Reliability and condition assessment
Failure analysis and equipment life studies to reduce unplanned downtime.
Maintenance software and AI
Digital maintenance tools, data analysis and predictive models built by our own software team.
What a monthly maintenance report shows you
An example for one process pump over six months. Select an indicator to see the trend and the next step.
| Jan | Feb | Mar | Apr | May | Jun |
|---|---|---|---|---|---|
| 94.1 | 95 | 95.8 | 96.4 | 96.9 | 97.2 |
What it tells you
The pump was available for 97.2% of its planned running time in June, up from 94.1% in January.
What we do next
Keep the current preventive plan and review the two longest stops of the period.
| Jan | Feb | Mar | Apr | May | Jun |
|---|---|---|---|---|---|
| 310 | 340 | 420 | 460 | 540 | 700 |
What it tells you
Failures are becoming less frequent. The pump now runs about 700 hours between two failures.
What we do next
Confirm which repair made the difference and apply it to the sister pump.
| Jan | Feb | Mar | Apr | May | Jun |
|---|---|---|---|---|---|
| 9 | 8 | 6.5 | 6 | 5 | 4 |
What it tells you
Repairs are getting shorter: four hours on average, less than half the January figure.
What we do next
Keep the critical spare parts on site, because waiting for parts was the main delay.
| Jan | Feb | Mar | Apr | May | Jun |
|---|---|---|---|---|---|
| 78 | 82 | 85 | 88 | 90 | 92 |
What it tells you
More than nine out of ten preventive tasks are now done in the planned week.
What we do next
Move the tasks that are still late into the next planned stop.
| Jan | Feb | Mar | Apr | May | Jun |
|---|---|---|---|---|---|
| 3.1 | 2.8 | 2.4 | 2 | 1.6 | 1.2 |
What it tells you
Open work orders now equal about one week of the maintenance team, down from three.
What we do next
Close the oldest work orders first and keep the backlog stable.
Example figures to show the format of a report. They are not results from a Niroos project.
Want a report like this for your plant?
Request a quoteWhat you receive
- Maintenance plan and schedule
- Critical spare parts list with sources
- Shutdown work scope and materials list
- Monthly maintenance report with key indicators
- Recommendations to improve reliability
Plants we support
All work is carried out under Niroos service contracts, with our own supervision and responsibility.
Industries we serve
Operation and maintenance: common questions
Do you take over full plant operation?
We start with defined scopes such as maintenance management, spare parts and shutdown support, and extend the scope as the cooperation grows.
Can spare parts be part of the contract?
Yes. Our procurement team sources and supplies the parts, so maintenance planning and supply are handled together.
Which plants do you support?
Power plants and substations, oil and gas facilities, water and wastewater treatment plants, steel plants, mines and cement plants.
Do you use software and AI in maintenance work?